How Did Miner Source Ship 100pcs Antminer S21j XP Hydro 495T Units to Dubai?

Facebook
X
LinkedIn

Table of Contents

SUMMARY

You want to build a large mining farm. You place a big order for 100 hydro miners. Then the waiting game starts. The supplier says the machines are in production. Then the delivery date moves. Then you worry about customs clearance. You worry about the boxes arriving broken. For a large operation, every day of delay costs real money. You need hardware that is ready right now.

On October 26, 2026, Miner Source prepared and shipped 100 units of the Antminer S21j XP Hydro 495T from our Hong Kong warehouse to Dubai, UAE. The order moved by air freight with DDP delivery. We checked the machines and packed them securely before dispatch. This gives our customer a smooth, door-to-door delivery.

A few weeks ago, our Dubai customer contacted us. They needed a large batch of high-efficiency hydro miners. They could not wait for factory allocation. They needed real stock. We confirmed the 100 units in our Hong Kong warehouse. We prepared the shipment. We arranged DDP air freight. The customer does not need to worry about customs. They just wait for the miners to arrive at their door.

What Makes the Antminer S21 j XP Hydro 495T a Top-Tier Miner for Large Farms?

Large farms need machines that do two things. They need to produce a lot of hashrate. They also need to do it without wasting electricity. The S21j XP Hydro 495T is built for this. It is a top-tier machine for professional Bitcoin mining. It uses SHA-256 to mine BTC, BCH, and BSV.

The Antminer S21 j XP Hydro 495T delivers 495 TH/s of hashrate. It consumes 5940W of power. This gives it a power efficiency of 12.0 J/TH. This is one of the most efficient hydro miners on the market today. For a 100-unit deployment, this efficiency saves a massive amount of money on electricity.

Full Specifications of the S21 j XP Hydro 495T

SpecificationDetail
ModelS21j XP Hyd. (495T-10)
Crypto AlgorithmSHA256
Supported CoinsBTC / BCH / BSV
Typical Hashrate495 TH/s
Power on Wall @35°C5940W
Power Efficiency @35°C12.0 J/TH
Phase3
Input Voltage380~415V
Input Frequency50~60 Hz
Input Max Current12 Amp
Network ConnectionRJ45 Ethernet 10/100M
Size (w/o package)430 x 176 x 208 mm
Size (with package)570 x 316 x 430 mm
Net Weight16.2 kg
Gross Weight18.3 kg

Why 12.0 J/TH Matters for 100 Units

The numbers look small on a single machine. But when you run 100 machines, the math changes. Let us look at the power draw. 100 units of the S21j XP Hydro run at 5940W each. That is 594 kilowatts in total. At 12.0 J/TH, you get maximum hashrate for that power. If you bought older miners with 20 J/TH efficiency, you would get much less hashrate for the same electricity. Large farms care about this. The S21j XP Hydro helps you maximize your power contract.

Why Are Dubai Mining Operations Moving Toward Hydro-Cooled Miners?

Dubai is a great place for crypto mining. The government supports it. There are free zones with good power. But Dubai has a problem. It is very hot. Summer temperatures often go above 45°C. If you run air-cooled miners in this heat, they struggle. Fans run at full speed. Miners throttle down. Hardware fails faster.

Dubai mining operations are moving toward hydro-cooled miners because air cooling cannot handle the extreme heat efficiently. Hydro miners use liquid coolant to carry heat away from the chips. This keeps the miners at a stable temperature. They run at full speed even when it is hot outside. For Dubai farms, hydro cooling is a requirement for stable profit.

The S21j XP Hydro Cooling System

Cooling ParameterRequirement
Inlet Coolant Temperature20~50°C
Coolant Flow8.0~10.0 L/min
Coolant Pressure≤3.5 bar
Working CoolantAntifreeze / Pure water / Deionized water
Coolant pH ValueAntifreeze: 7.0~9.0
Pure water: 6.5~7.5
Deionized water: 8.5~9.5
Pipe Connector DiameterOD10 mm

Why Water Beats Air in the Desert

FeatureAir CoolingHydro Cooling (S21j XP)
Heat RemovalFans push hot air outCoolant carries heat away
Performance in 45°CThrottles, drops hashrateRuns stable at full speed
Noise LevelVery loud (75+ dB)Quieter operation
Dust IssuesFans clog with sandSealed loop, no dust
Miner LifespanShorter due to heatLonger due to stable temps

Our Dubai customer knows this. They run a professional farm. They cannot afford downtime. They chose the S21j XP Hydro because they know it will keep hashing through the Dubai summer.

How Does a 100-Unit Order with DDP Air Freight Simplify Global Mining Logistics?

Shipping 1 miner is easy. Shipping 100 miners is hard. You have to deal with freight forwarders. You have to arrange customs clearance. You have to pay import taxes. If you do not do it right, the machines sit in customs for weeks. DDP shipping solves this.

DDP stands for Delivered Duty Paid. When we ship with DDP, we handle everything. We book the air freight. We clear the customs in Dubai. We pay the duties and taxes. We deliver the 100 miners to your door. You do not need a customs broker. You do not need to fill out complex paperwork.

What DDP Covers for a 100-Unit Order

StepWho Handles It?
Export Paperwork in Hong KongMiner Source
Air Freight Booking (100 units)Miner Source
Dubai Import Customs ClearanceMiner Source
Import Duties and TaxesMiner Source
Final Delivery to the FarmMiner Source

Air Freight vs. Sea Freight for 100 Units

Shipping MethodTransit TimeBest For
DDP Air Freight3-7 business daysFast deployment, high-value miners
Sea Freight3-6 weeksVery large orders with flexible plans

Our customer chose air freight. They want the machines hashing as soon as possible. Every day the miners sit in transit is a lost day of Bitcoin earnings. DDP air freight gives them speed and peace of mind.

Why Does Real Hong Kong Warehouse Stock Matter for Wholesale Buyers?

Many suppliers in the market do not hold real stock. They take your order. Then they try to find the miners. They might buy from the factory. They might buy from another trader. If the market is tight, you wait. Sometimes you wait for months. Sometimes the order gets canceled. This is a bad way to run a mining business.

Real Hong Kong warehouse stock means the 100 Antminer S21j XP Hydro units were already sitting in our building when the customer ordered. We own the inventory. We can take photos of the boxes. We can pack and ship immediately. We do not make you wait for factory production.

Real Stock vs. Factory Allocation

Supply TypeWhat It MeansBuyer Risk
Real Hong Kong StockUnits are ready in our warehouseLow risk. Fast shipping.
Factory AllocationUnits wait for the factory to release themMedium to high delay risk
Pre-OrderUnits are not built yetVery high delay risk

How We Prepare 100 Units for Shipping

Before the 100 units left our warehouse, our team did the following:

  • Checked the model numbers to ensure they are S21j XP Hydro 495T.
  • Inspected the boxes for damage.
  • Protected the coolant ports and connectors.
  • Palletized the units for safe air transport.
  • Took photos of the packed goods for the customer.

We do this for every order, whether it is 1 unit or 100 units. We want the machines to arrive exactly as they left our warehouse.

Looking for Bitcoin, Litecoin, or Zcash Miners? What Else Can Miner Source Supply?

The S21j XP Hydro is a great machine for Bitcoin. But we know miners have different needs. Maybe you want to mine Litecoin and Dogecoin. Maybe you want to test Zcash. Maybe you need accessories like power supplies or control boards. We supply all of this.

Miner Source specializes in supplying cryptocurrency mining hardware worldwide. We work with trusted brands including Bitmain (Antminer), MicroBT (WhatsMiner), Avalon, Goldshell, IceRiver, and ElphaPex. We supply miners for Bitcoin, Litecoin, Dogecoin, Zcash, and other specialized ASIC mining machines. We also provide power supplies, control boards, cables, and liquid cooling infrastructure.

What We Can Supply

Product CategoryExamples
Bitcoin Miners (SHA-256)Antminer S21 series, WhatsMiner M60/M70 series
Litecoin/Dogecoin Miners (Scrypt)Antminer L7, ElphaPex DG Hydro 1
Zcash Miners (EquiHash)Antminer Z15 Pro, Z15K, Z11
Hydro MinersAntminer S21j XP Hydro, S21e XP Hydro, WhatsMiner M73
AccessoriesPSUs, control boards, cables, air switches
InfrastructureLiquid cooling CDUs, containers, cabinets

When You Contact Us, Please Share

DetailExample
Model NeededS21j XP Hydro, M73, Z15K, etc.
Quantity1 test unit or 100+ wholesale batch
Destination CountryUAE, USA, Germany, etc.
Shipping MethodDDP Air, Express, Sea Freight
TimelineUrgent or Planned Purchase

You can reach us here:

Conclusion

On October 26, 2026, Miner Source prepared and shipped 100 units of the Antminer S21j XP Hydro 495T from Hong Kong to Dubai. The machines deliver 495 TH/s at 5940W with an efficiency of 12.0 J/TH. We used DDP air freight so the customer does not have to deal with customs.

This shipment shows how we work. We keep real stock in our Hong Kong warehouse. We handle the logistics and customs. We pack the machines securely. We support both small test orders and large wholesale batches. If you need mining hardware, contact Miner Source. We are your reliable partner.

MinerSource.shop — Reliable Miners. Global Shipping.

Subscribe for our daily marketing price list